INZAG Germany GmbH has shown, since its creation, a high capacity for structuring and committing to deliver the best solution to the client. As a development resource of the Zagope Group, INZAG is strengthened by its own construction and reconstruction challenges, both of all kinds of infrastructures worldwide and large and complex project works from AG Group.

PROJECTS AND BUSINESSES

INZAG Germany GmbH participated in different projects of deserved prominence.

PROJECT FOR SYSTEMS OF WATER SUPPLYING, BASIC SANITATION AND WASTEWATER TREATMENT OF THE CITY OF LUBANGO

Main Contracting Parties – Client: “Ministério da Energia e Águas - M.I.N.E.A.”. GAUFF GmbH & Co. Engineering KG acted on behalf and on account of MINEA.

Location: Lubango, Province of Huíla, Angola

Description: Execution of Water Mains (Transport Pipelines) where all performed works included earthworks and manholes. The section totals approximately 30,7 km of extension and includes cast iron piping with different diameters ranging from 200 mm to 1000 mm, 39 Reinforced Concrete boxes and manholes. 80% of the project work is located in the urban area of the city of Lubango.

PASSENGERS TERMINAL OF THE AIRPORT OF SOYO

Main Contracting Parties – Client: ENANA - EP (Empresa Nacional de Aeroportos e Navegação Aérea, EP)

Location: Soyo, Province of Zaire, Angola

Description: Execution of the Passengers Terminal and Administrative Building of the Airport of Soyo, in Angola. This project was of vital importance for the Angolan government, since it improved the accessibility of the population in this region characterized by difficult road access.

PASSENGERS TERMINAL OF THE AIRPORT OF LUENA

Main Contracting Parties – Client: ENANA - EP (Empresa Nacional de Aeroportos e Navegação Aérea, EP)

Location: Luena, Province of Moxico, Angola

Description: Performed by resorting to a German credit line, this project work consisted of designing and executing the Passengers Terminal and Administrative Building of the Airport of Luena. This terminal accommodates 500 passengers, during the rush hour, in its embarking and disembarking rooms.

PASSENGERS TERMINAL OF THE AIRPORT OF DUNDO

Main Contracting Parties – Client: ENANA - EP (Empresa Nacional de Aeroportos e Navegação Aérea, EP)

Location: Dundo, Province of Lunda Norte, Angola

Description: The passengers terminal of the airport of Dundo was built in an area with 2.558 square meters, with the capacity for 300 passengers during the embarking and disembarking time. The passengers are offered a restaurant and several stores and it is foreseen the opening of car rental services to make travellers lives easier.

PASSENGERS TERMINAL OF THE AIRPORT OF SAURIMO

Main Contracting Parties – Client: ENANA - EP (Empresa Nacional de Aeroportos e Navegação Aérea, EP)

Location: Saurimo, Province of Lunda Sul, Angola

Description: The embarking rooms of the domestic terminal can accommodate approximately 300 passengers. It is part of the rehabilitation project of three other airports (Soyo, Luena and Dundo).

STEEL MILL OF VENEZUELA

Main Contracting Parties – Client: Government of Venezuela; Construction in Venezuela (EPC): Andrade Gutierrez Engenharia S.A.; Supply of Equipment and Technology: SMS Group GmbH ; Services: INZAG Germany GmbH.

Location: Puerto Ordaz, Bolívar State, Venezuela

Description: Execution of the Steel Mill of Venezuela with the capacity for producing 1.550.000 Tons of liquid steel per year to be transformed in carbon steel and special steel plates and coils. From 2014 to 2016, INZAG executed manufacturing inspection and supervision services of approximately 70.000 T of equipment for the Reference and Supervision Project, including technical and logistics support to the training program carried out in Germany, in the SMS Group GmbH facilities, with a maximum of 90 people. During this period, INZAG kept its collaborators in Düsseldorf and Hilchenbach, near the main production and administration centers of the Contract.